Global Ties Aviation
← SERVICES

Brightwork

Leading edges and nacelles returned to mirror.

What is brightwork?

Brightwork is the multi-stage polishing of bare or clad aluminium — leading edges, nacelles, exhaust stacks — to a mirror finish, then sealed to slow re-oxidation. Scope depends on how far oxidation has advanced, which is why we assess before quoting.

HOW PRICING WORKS

Scoped to your airframe, confirmed by a person.

Brightwork scales with aircraft class and condition, so we do not publish a sticker price. Use the AI calculator on the services page for an instant estimate, or send the booking request — our team reviews the aircraft and comes back to you with the final price before anything is scheduled. Nothing is ever charged without your approval.

FULL SCOPE

  • Assessment of oxidation depth and existing polish history
  • Multi-stage cut, refine and finish on all clad aluminium
  • Exhaust stack and tailpipe soot removal and polish
  • Nacelle lip and inlet ring finished to mirror
  • Sealant applied to slow re-oxidation

APPROVED MATERIALS

  • Progressive aviation polishing compounds, coarse through finish
  • Dedicated non-contaminated pads per stage
  • Metal sealant with UV inhibitor

QC CHECKPOINTS

  • Reflection check against a straight edge at three angles
  • No compound residue in seams, fasteners or rivet lines
  • Adjacent painted surfaces masked and inspected after unmasking

WHAT THIS PROTECTS

Oxidation is progressive. Polished and sealed aluminium stays serviceable; neglected aluminium eventually needs material removed, and there is a finite amount of cladding to give.

Questions owners actually ask

How long does brightwork stay mirrored?
Sealed brightwork holds 4–8 months depending on environment and utilisation. Coastal and high-cycle operations sit at the short end.
Can heavily oxidised metal be recovered?
Usually, but it takes more stages and more hours. We assess before quoting, because the honest answer is sometimes that the cladding is too far gone to chase.